Site Map
Duties include troubleshooting, repairing and performing preventive maintenance for automated test equipment, board testing, first and final test, and burn-in for testing custom power supplies; filling in for floor managers when necessary; facilities operator for the environmental system which controls heating, ventilation and air conditioning; controlling the security system (card readers), fire alarm system, and lighting for the building; working with data generated from the automated test systems and compiling this information in Microsoft office software, Access for data bases, Excel for spreadsheets, and Word for word processing. Major projects: Project manager for the design, building, and implementation of a PC controlled, 440 station, regulated elevated temperature, automated burn-in room with monitoring capabilities; design and build loads for testing of power supplies; member of both design and production teams for new product; worked extensively with PC's, linear and non linear power supplies, Metasys system software, Oracle business systems, and Demand Flow Technology production philosophy.
EXPERIENCE Satellite Installer/General Contractors 4/88 - 3/93 Super Sound Superstore, Wellsville, New YorkDuties included installing kitchens and bathrooms; install and repair of dry wall; electrical and plumbing duties; and installing and repairing satellite dishes
Maintenance Engineer 6/86 - 3/88Radison Plaza Hotel, Orlando, FloridaDuties included repairing electronic door locks, kitchen appliances, drywall, air conditioning units; and various phases of heating, plumbing and electrical repairs.
Wellsville Republican Committeeman 11/98 – 10/04
Wellsville Republican Committee Chairman 1/00 – 10/04 Allegany County Executive Committee 1/04 – 11-04