Prerequisites:
BLCT 3413 with “D” or better and BLCT 3423 with “D” or better and BLCT 3433 with “D” or better and BLCT 3443 with “D” or better and BLCT 3453 with “D” or better and BLCT 3463 with “D” or better and BLCT 3473 with “D” or better and BLCT 4143 with “D” or better and BLCT 4153 with “D” or better and BLCT 4163 with “D” or better and BLCT 4173 with “D” or better and BLCT 4183 with “D” or better
Description:
The objective of this course is to develop an understanding of various piping systems used in hydronic heating systems including series loop, one pipe two pipe (direct and reverse return) and primary/secondary piping. We will also discuss the applications and installations available for a variety of radiant heating types.